Plant Room Projects

Commercial

HMP Risley

HM Prison Risley is a category C men's prison, located in the Risley area of Warrington, Cheshire, England, operated by His Majesty's Prison Service.

BIM Yorkshire carried out a Boiler Replacement on G Wing. It required off-site design in order to allow fabrication minimising the time on site and associated costs of labour working within a prison.

Commercial

Helicon Building, London

There was an issue with water chemistry in both particulates and gas within the heating and chilled pipework systems. BIM Yorkshire designed the integration of side stream filtration and de gassing work within the associated plant room.

 

Sporting Facilities

Virgin Active, Broadgate

As one of the premium classic clubs, the clients focus is always on the highest possible client experience.  Within these clubs it is a fine balance between the visual impact of the services and their environmental impact on the space.

There was a catastrophic leak from the occupier above the demise, resulting in the immediate closure of the premises. The main ventilation plant room had been left in operable and requiring complete replacement. However the result of the demise was to be left in tact as much as possible, meaning all new equipment needed to be flat packed and brought through a standard lift.

The original systems were from the 1960s and had no form of heat recovery however all new systems were required to comply with current regulations and good practise. As such size of equipment required to go in the room was noticeably larger than what it was replacing. Co-ordination of this room was challenging based on this and BIM Modelling was critical to achieving the end result.

The client was extremely pleased with our cooperation on this progress and the successful outcome we achieved.